At this moment, the Watergeus is my house, a comfortable cozy houseboat. This blog starts when I found the ship and will continue for as long as I own the ship. Any progress will be published in this section. It also contains some of my personal notes!
The whole story started on 27th December 2005 when Andy an I drove to Sluiskil to have a look at a small fishing boat for sale…
2005 • 2006 • 2007 • 2008 • 2009 • 2010 • 2011• 2012 • 2014 • 2015 • 2016 • 2017
- 2005
- December 2005: Discovering the boat
- 2006 – Yard and outside work
- January 2006: Cleaning the boat and running the engine
- February 2006: Painting the boat and building a wooden roof
- March 2006: Painting and preparing he for selling
- April 2006: I bought the boat
- May 2006: Dry-docking & survey
- June 2006: Cleaning the boat
- July 2006: Repairing the boat at the yard
- August 2006: Cleaning the engine room
- September 2006: Removing the wooden roof
- October 2006: Building the den and cabin
- November 2006: Building the den
- December 2006: Finishing the den and placing the hatches
- 2007 – Outside work
- January 2007: Placing the windows
- February 2007: Building a waste water tank & sailing to Bruges
- March 2007: Finishing the roof & putting electricity in the back accommodation
- April 2007: Cleaning the bilges for a last time
- May 2007: Building a floor
- June 2007: Building the floor
- July 2007: Designing the roof and doing some smaller jobs
- August 2007: Preparing to build the roof
- September 2007: Building the roof
- October 2007: Finishing the roof / cleaning the boat
- November 2007: Doing it a bit slower: planning
- December 2007: Replacing exhaust and adjusting back accommodation
- 2008 – Starting the hold
- January 2008: Planning and starting the hold
- February 2008: Putting the watertanks in
- March 2008: Starting in the hold
- April 2008: Working in the hold, insulation and crane
- May 2008: painting the outside,hatches and wood work on the inside
- June 2008: Inside work
- July 2008: Inside work (part 1)
- August 2008: Inside work and new windows
- September 2008: Electricity and the inside
- October 2008: Batteries, engine room and office space
- November 2008: Sleeping room and electricity
- December 2008: Sleeping room and living room
- 2009 – Continuing on the hold
- January 2009: Bulkhead between tanks and living area
- February 2009: Wood work, corridor and frame around the windows
- March 2009: Finishing the main wood works & Control panel for the engine
- April 2009: Finishing the living room
- May 2009: Plumbing and living room
- June 2009: Living room
- July 2009: Living room, kitchen and sailing trip in the Netherlands
- August 2009: Living room and bathroom
- September 2009: Central heating and painting
- October 2009: Kitchen and painting
- November 2009: Decorating the living room
- December 2010: Mast
- 2010 – Outside work
- January 2010: Front area
- February 2010: Collecting pieces
- March 2010: Deck
- April 2010: Dec, crane and hatch
- May 2010: Deck
- June 2010: Another boat, another story
- July 2010: Bilge cleaning on the Frantsis and front cabin of the Watergeus
- August 2010: Outside work on the Watergeus
- September 2010: Converting the back accommodation
- October 2010: Plumbing the back accommodation
- November 2010: Back accommodation
- December 2010: Back accommodation and the yacht Escapade
- 2011 – Back accommodation & MJ Escapade
- January 2011: Back accommodation
- February 2011: Back accommodation and Escapade
- March 2011: Plumbing and kitchen in the back accommodation (part 1)
- April 2011: Snik Hornblower
- May 2011: Snik Hornblower
- June 2011: Nothing at all
- July 2011: Not much!
- August 2011: Deck and outside work
- September 2011: Front cabin: finishing the front
- 2012 -Yard visit for the Watergeus
- January 2012: Thinking about a yard visit
- March 2012: Generator and big cleanup
- May 2012: Going to the yard
- June 2012: Yard visit and painting the ship
- 2014
- August 2014: Small jobs and maintenance
- September 2014: Small jobs and maintenance
- 2015
- April 2015: Fire on the Watergeus
- May 2015: Creating some more space
- June 2015: Front accommodation
- July 2015: Repairing the outside of the Watergeus
- 2016
- July 2016: Painting the outside
- August 2016: Painting the outside
- September 2016: Painting the outside
- 2017
- February 2017: Emptying the wheelhouse
- September 2017: Getting her ready for CVO (communautair certificaat)
- October 2017: Getting her ready for CVO (communautair certificaat)
- November 2017: Getting her ready for CVO (communautair certificaat)