24th May 2013 – Three days of work ahead. A lot of plans. I want to clean out the engine room and the break down the big bedroom to extend my workshop.
It is cold and a lot of rain keeps me away from doing an outside job. Therefore I started with the bedroom. The construction exists of layers, many layers. There was laminate, insulation, plastic, chipboard, rubber, linoleum and then the wooden cargo floor. The walls were no different. The ceiling was the hardest bit. They used more nails then there were rivets in the whole boat.
By the end of the evening, the most of the room was gone, still one part of the floor was there.