21-22-23th July 2006 – A long weekend, three days of hard work with an average temperature of 42°C. Since Tuesday the rudders had been repainted. They look much better now!
The second part of the Technical room was painted. I put the metal floor back in that space. Since this area is clean now, I decided to move my engine spare parts from the engine room. Everything looks clean now, so it gives me a more comfortable feeling. I don’t like working in a messy engine room.
At the other end of the boat, the bilges were cleaned and painted. Next week, I put a floor in that area as well. It is to dangerous to walk on the ribs, one moment of not paying attention is enough to fall and break a leg.