7th October 2010 – I still had to close the wooden construction where water pipes are running through. It is a job that I had to do a longtime ago. Together with the wood I ordered on Monday, I bought some planks to close the gap.
7th October 2010 – I still had to close the wooden construction where water pipes are running through. It is a job that I had to do a longtime ago. Together with the wood I ordered on Monday, I bought some planks to close the gap.