27th May 2020 – I mounted the light boxes and the foot for the name sign I received yesterday. The welding of the pipe is finished, so is the support for the mast. On the inside, some more welding was done between the ribs and the ceiling.
Once everything was finished, I gave it a coat of primer. Looking better now!