11th April 2009 – The area where the pump and watertanks are stored is called technical area #2. In a few weeks time, we will finally connect the tanks. There is no insulation in that room, so I decided to change this. We made the wall to the living area insulated and the roof. Since it was over 35°C in that room, we had to stop working after a while. Every hole we drilled in the metal was becoming harder and harder.