26th November 2011 – I’m planning to finish the bathroom by the end of the month. I still need to build a frame for one side, put insulation and cut the sheets of multiplex in the right size. Electricity and plumbing also needs doing.

By the end of the evening, most wood work was done.

Next Friday, I will have my two new water tanks. They will come in the front of the boat in the bathroom. I have chosen this area, since all water pipes are on a short distance. The boiler an pump are also in the same room. This makes it easier to manage if something would go wrong.

The water tanks will come on a small stage. The stage connects the bulkhead to the floor in the bathroom.