15th August 2014 – A national holiday on a Friday. This is perfect for a long weekend of working aboard the Aquarel. The only element I couldn’t count on was the weather. The whole day was raining. Anyway, I managed to weld the remaining supports for the hatches. At least when it is stormy, I don’t have to worry to much about losing them.

Heavy rain continued and therefore it was necessary to work inside. The metal framework for the watertanks was welded. The watertanks float above the wooden floor. In case I have to weld at the yard, I can get access to the bilges without moving my tanks.