15th March 2017 – Time to be constructive again. I built the back wall for the Library room and mounted a heavy beam to the ceiling. This will server as support for the fake wooden hatches. It took me some time to lift an 80kg beam by myself. I’m happy the frame was holding the beam. I’ve strengthened the frame in the meantime to have no accidents.