Tordino – Bathroom part V Posted on 12 November 2019 by frederic - Updated 1 June 2020 12th November 2019 – I made the floor and put one coat of oil on it to protect it. The green paint wasn’t dry, so I had to work on the floor. It took me most of the day to build the floor. Since it was raining, I had to cut every piece by hand. MS Tordino