14th December 2019 – The bedroom was finished, the bathroom continued and in the hold, both beams were connected to each other. Another support was build.
![Bedroom](https://livingafloat.com/www/wp-content/uploads/2019/12/tor1-e1577269899688.jpg)
![Wooden support](https://livingafloat.com/www/wp-content/uploads/2019/12/tor91.jpg)
![Connecting wooden beams](https://livingafloat.com/www/wp-content/uploads/2019/12/tor92-e1577269944102.jpg)
![Bathroom nearly finished](https://livingafloat.com/www/wp-content/uploads/2019/12/tor93.jpg)
![Mounting the wooden beams](https://livingafloat.com/www/wp-content/uploads/2019/12/Tor2-e1577269989179.jpg)
14th December 2019 – The bedroom was finished, the bathroom continued and in the hold, both beams were connected to each other. Another support was build.