9th August 2020 – A few small jobs were done. I cleaned the bilges on starboard, cleared that side of the yacht and started building a frame for the insulation and t&g. Slowly getting there, but it is really to warm to work.
The old outlet for the kitchen sink was sealed and the gap between the old and new deck as well. At least I hope to stop condensation getting to the old decks.