18th August 2020 – Did half of the ceiling for the bedroom, insulation and t&g. The more insulation I can use now, the less I have to move to build the bed and the front of the ship.
18th August 2020 – Did half of the ceiling for the bedroom, insulation and t&g. The more insulation I can use now, the less I have to move to build the bed and the front of the ship.