Watergeus – Fixing the door

6th October 2007 – The man of the yard came to discuss the further plans on the boat, building a skylight, redoing the door and making a price for my exhaust pipe the broke sometime during last week.

Since the exhaust is broken, I just can’t start my engine anymore. Everything needs replacing once, not that now is the right moment, but hey we shall see.

Watergeus – Buying paint and cleaning the bilges

29th September 2007 – Paint is one of the most expensive costs on a boat. Since I have the boat, I had used several brands of paint, all what I found and got has been used by now. The final coat needs to be good, so I bought some paint. Didn’t have much paint for a few hundred Euros.

In the afternoon I continued hovering out the bilges and removing some more of the floor to get to the bilges. There are still a few buckets left. Most of it is drying out nicely, but if there is too much, it just stays.

While walking along the quay I noticed the boat in the front is back after nearly a year. A Dutch tjalk called Arriver is back. A small, but nice ship. It has a sign for sale. Nice, but to small to live on I believe. So this makes us three Dutch barges in the dock, the tjalk, my neigbour with his Katwijker and me with my Luxe Motor.

Watergeus – Some more welding

25th September 2007 – The man finished most of the roof by now. He welded the other end of the roof, so by now if it rains, it should no longer enter the boat. Next week he will weld the other side where a strip of 10cm was welded. Also the inside needs a second weld. I can already see the end of phase 1.

Watergeus – Emptying bilges

24th September 2007 – I don’t have the feeling for working today, it was too good yesterday…. Besides my stomach, the weather was terrible as well. A lot of rain, so no option for welding. The weather tomorrow is even worse, so I’ve decided to work again and change my holidays to another period, maybe next week.

I hovered some of the bilges, most of it is drying quickly, not bad. But I forgot to close the portholes, so I t rained again inside. Oh what do I love to be summer again…

Watergeus – Cleaning and drinking

22nd September 2007 – In the morning I hovered out some more water from the bilges. I cleaned the cargo hold, it was getting time. Everywhere were electrodes, broke glass from that window, dust, etc…

In the late afternoon my friends from Sluiskil who built the boat came. We had a small meal and a few drinks on the deck. Probably the best day of the year and the last one. Till 9 o’clock it was good weather, then it became dark. They also helped me mooring the boat better. At the back the ropes were a bit loose and bashing to the accommodation causing damage to the paint. Since I have to much trouble with my hand I decided to let them do it. In no time it was done and the boat was stable again.

Watergeus – Putting back the hatches

21st September 2007 – The whole roof is welded, three times 23 meters, twice at the sides and once in the middle. He welded the last bits today. The next step will be to close the gaps at the front and back.

In the evening we placed the hatches back in the right order. Fortunately they were numbered. We discovered having not enough hatches when arriving at the front of the boat.

I worked it out after working for two hours. Since the hatches used to be placed under tension and the den was not right, the hatches had to be moved and lifted before the bolts fitted. So I had enough hatches. It is hard to explain how I did it, but is even harder to do it again.

Watergeus – Welding

20th September 2007 – He welded further on the sides of the roof. It should now be drier if it rains. Seeing first, then believing.

I’m starting to miss the idea of opening a hatch. I remember in April when I was in Amsterdam, somebody said it is great to have a metal roof, but make sure you can open something. Well she was right. I talked to the man of the yard wether the skylight could be made so something can open.

The design slighty changed and now the whole skylight can open. It will take at least two people to open it, but hey in summertime (if we ever have it again) it is great to have some fresh air inside the boat and living accommodation.

Watergeus – Welding

19th September 2007 – I believe the coming days won’t be much to write about. Welding is a boring job that is taking a lot of time. Depending on what to weld, it takes around two hours for welding 1.5 meters. Often he welds more in that time, but if the gaps are to big he needs to add more metal and weld it twice.

Watergeus – Cleaning the bilges

18th September 2007 – Again heavy raining, the same as yesterday. Difference today was that it was light in the cargo hold. All buckets were running over, bilges filled with water…. Something I didn’t notice yesterday. Only If I would have known then.

I hovered out the bilges and more then 100 buckets were emptied over board. Still I don’t see the difference, a real disaster. If I would have used gyproc plates I could have thrown them all away. Therefore it is important to only use wood that is waterproof or survives for a period in water. Also make your interior ready to be easily removed in case of emergency. I only had to undo a few screws and I could see and touch the bilges.

Watergeus – Scrapyard

15th September 2007 – While loading the metal in the car I decided to keep a strip and a hatch, even if it is broken. The hatch is of the same style as the hatches in front of the wheelhouse. I do have a spare hatch and now with this one I can create something in the front in the future.

When the car was on the slipway to check the weight, it was 700kg, so still a nice sum of money to spent to place the portholes in the front. I even have a spanner and pipe for the fuel tank, free! If I would have stayed longer on the scrapyard, I would have bought plenty of stuff. Incredible what people throw away. I would be in shame if I trew this away.

In the afternoon I started breaking out the floor of the front peak. Woodworm had eaten so much I felt through on one location and it would not have taken long before it was on multiple locations. I knew the floor was not good and water was in the bilges, but last year I needed a space to store my stuff so I used it as it was.

 

Last week I cleaned it out and today I would start with the bilges, what a mess!

Watergeus – Scrap metal

14th September 2007 – While the man was welding the roof, I cleaned the rest of the front space. I called a friend to know if he was interested in a deal with scrap. When he agreed all metal pieces left in the front and back of the boat were put on deck. It is something between 750kg and 1000kg I believe. We’ll bring it away tomorrow.

Watergeus – Attaching the sheets of metal to the ribs

13th September 2007 – The whole day was spent stitching the inside of the hold. All plates were welded to the ribs, welding 5cm, leaving 50cm. A very boring and uncomfortable job, welding above your head.

In the evening I cleaned my old waterpump engine, a Briggs & Stratton from 1952. I would like to put this engine as part of the decoration in the living room. It took me three hours to clean most of it, removing the old oil, fuel, etc… 

I looked on the Internet how I should repaint it. Only I didn’t fond a colour scheme.

 

 

Watergeus – Welding on the roof

12th September 2007 – One plate had to be cut, and the other one had to be put in position. It took us all morning to fit in those last two points. Not only goes the boat narrower, it is also the place where the boat makes it curve.

By the early afternoon, he could start stitching the ribs.

Watergeus – No welding but cleaning

11th September 2007 – No welding today. Cleaned out the front space, so it is ready for putting portholes. I discovered a lot of stuff I didn’t know I owned it. Some of it is to heavy for use, but nice as decoration. What I could easily conclude; A small space can contain a lot of stuff!

In the evening I went to the other side taking pictures of the boat, so I could have an idea how she would look like without hatches: